Stenhoj Ds2 Manual Today
Lay out all components on the shop floor.Verify all parts against the packing list included in your physical manual.Position the base plates according to the desired bay width. Step 2: Standing the Columns
The lifting screws require immediate lubrication. Worn Bearings: Top or bottom bearings may need replacement. stenhoj ds2 manual
Drill holes into the concrete through the base plate holes.Use high-quality expansion anchors or chemical resin anchors.Torque all bolts to the manufacturer’s specified settings. Step 4: Connecting the Top Crossbeam Lay out all components on the shop floor
Ensure the emergency stop button is not pushed in. Lift Lowers Unevenly Drill holes into the concrete through the base plate holes
Regular upkeep keeps your Stenhoj DS2 operating safely for decades. Daily Checks Visual inspection for oil leaks or loose bolts. Ensure lift pads are clean and not torn. Check that arm locks engage properly when raised. Monthly Maintenance Grease the main lifting screws and safety nuts. Check the tension of the synchronization cables or chains. Inspect the rubber pads for wear and replace if needed. Annual Inspection Measure the wear on the main load-bearing bronze nuts.
Electromechanical (dual motors or single motor with chain). Lifting Height: Approximately 1,900 mm to 2,000 mm. Lifting Time: Around 45 to 50 seconds.