: The individual is linked to a valid Letter of Authorization (LOA) from a concession-holding company like ADNOC . Core Requirements for CICPA Pass Issuance
: Pay the relevant fees (typically AED 100 for individuals) and await the "Verified" status.
: Required for all companies working within the oil and gas sector.
: All submitted documents, including trade licenses and Emirates IDs, have been validated.
: Select the required permit type (Individual, Vehicle, or Vessel) and enter the "7096" or relevant permit code if applicable.
: The company must be registered on the Abu Dhabi mainland; free zone licenses are generally not eligible for ADNOC-controlled sites.
: An invitation letter from the facility owner (e.g., ADNOC) specifying the project duration and site access needs.
The CICPA (now often integrated with the National Guard Command) oversees the protection of Abu Dhabi's vital assets. is the automated system used to manage these gate passes, ensuring that every individual entering a site has undergone rigorous security screening and background checks. A "Verified" status on the portal indicates that: