Aqmos R2d272 Installation Verified Work May 2026

: Install the bypass valve on the back of the control head, securing it with the provided clips and screws.

: Attach the stainless steel hoses to the bypass. Ensure flat seals are correctly placed in the connections. aqmos r2d272 installation verified

Before starting, ensure your installation site meets the following verified criteria: : Install the bypass valve on the back

Once connected, the electronic must be configured: Before starting, ensure your installation site meets the

: Fill the cabinet with up to 50 kg of high-purity salt tablets (NaCl). 3. System Programming and Commissioning

: Must be a flat, dry, and frost-free indoor area protected from direct heat sources.

Ensuring your is verified and functioning correctly is essential for maintaining a limescale-free home. This guide provides a comprehensive walkthrough for a successful setup of the water softener. 1. Site Preparation and Requirements